Design-Build Construction In One Month

Also, if your building plans involve construction of replicable, prototype facilities, the design-build with systems construction process further optimizes time/cost savings.

These advantages are exemplified in a 1,000,000 sq. ft. warehouse and distribution center for a major U.S. discount retailer. Built in strategic partnership with Butler®, turnkey construction time was reduced 30%; building shell costs were reduced 17%; and the shell was completed in a mere 28 days.

The following photos are actual results of a strategic engagement with Butler on a prototypical 1,000,000 sq. ft. warehouse and distribution center: erected in less than one month.

Design-Build Construction In One Month

Day 01

Design-Build Construction In One Month

Day 15

Design-Build Construction In One Month

Day 20

Design-Build Construction In One Month

Day 28

For full details regarding these case studies, or to discuss speed-to-market advantages specific to your project, talk with a Butler Corporate Accounts Manager. We’ll arrange a convenient time to meet once you complete this contact form.