Design-Build Construction In One Month
Design-build construction has always delivered proven speed-to-market advantages. It can slash months off already aggressive schedules. In addition, when design-build is used in conjunction with a systems construction approach, timelines are condensed even more significantly, because critical project functions happen concurrently.
Also, if your building plans involve construction of replicable, prototype facilities, the design-build with systems construction process further optimizes time/cost savings.
These advantages are exemplified in a 1,000,000 sq. ft. warehouse and distribution center for a major U.S. discount retailer. Built in strategic partnership with Butler®, turnkey construction time was reduced 30%; building shell costs were reduced 17%; and the shell was completed in a mere 28 days.
The following photos are actual results of a strategic engagement with Butler on a prototypical 1,000,000 sq. ft. warehouse and distribution center: erected in less than one month.