Newington Energy

Newington Energy

Project Details

Newington, New Hampshire
60,000 square feet
End Use: Manufacturing and Industrial

This 60,000-square-foot multi-unit combined cycle complex includes a 40,000-square-foot turbine building that houses two gas turbine generators and one steam turbine generator in one facility. Butler Heavy Structures provided a hybrid structural steel framing system that incorporated both conventional and pre-engineered components for the buildings.

To accommodate strict sound transmission requirements, a special acoustical wall panel was supplied as part of the builder’s package. Welded-up, step-crane columns were used in the gas and steam turbine building to support a 70-ton top running crane that traverses the 314′ length of the building. Framing for this section of the complex was complicated by a 50′ roof step and heavy support framing for two large filter house units. A standing seam metal roof system was used on all of the units.

Find Out How Butler’s Wall Systems Can Improve Your Building

Connect with us for details about how we can solve your specific wall system needs.